File size 14K; General Info
|
|
File size 4.4M; Mapping of Sewer Mains and Manholes
|
|
File size 2.1M; Mapping of Lift Station Locations
|
|
File size 11K; Liftstation Addresses and other information
|
|
File size 4.1M; Aerial photo of plant
|
|
|
|
File size 158K; Photos of facility that receives sewage at plant.
|
|
File size 629K; Photos of oxidation ditch at plant
|
|
File size 215K; Photos of original treatment facilities at plant
|
|
File size 155K; Photos of settling basins at plant
|
|
File size 117; Photos of facilities where disinfection takes place at plant
|
|
File size 177K; Photos of facilities where disinfection takes place at plant
|
|
File size 29K; Sewer main replacement requirement
|
|
File size 28K: Lift Station repair and replacement requirement
|
|
File size 26K; Sewer Trunk main repair requirement
|
|
File size 21K; Overall funding shortfall last 6 years
|
|
File size 28K.
|
|
File size 2.2M; Fiberglass/Epoxy lining candidates
|
|
File size 2M; Fiberglass/Epoxy lining candidates
|
|
File size 4.1M: Repair Locations on North Interceptor Trunk Main (Lining)
|
|
File size 1.7M; Repair Locations on South Interceptor Trunk Main (Lining)
|
|
File size 2.8M; Remove & replace locations on South Interceptor Trunk Main
|
|
File size 13K; Operating in the red
|
|
File size 29K.
|
|
File size 17K; Comparison of cost for wastewater service
|
|
File size 12K; Comparison of cost for wastewater service
|
|
File size 14K.
|
|
File size 19K; Major Capital Projects listing initially proposed by consultant
|