Right of Way Permit & Information

Right-of-Way Permit Application (Utility Permit)
Required for any installation or construction of Utilities or Facilities in the City of O’Fallon Right-of-Way (ROW). This includes but is not limited to: Gas, Electric, Telephone, Cable Television, Cellular, Fiber Optics, Water (including irrigation lines), Sanitary Sewer, Chemical Treatment and Tree Cutting/Removal. You must obtain a permit prior to the start of any work and have a copy of the permit at the work-sire at all times. The work may consist of, but is not limited to: Excavating, Placing fill materials, Grading, Paving, Surveying, Boring, Installing an overhead line and Blocking traffic.

Please submit the permit application and drawings to Heide Bell at [email protected].

Right-of-Way Ordinance
City of O'Fallon Ordinance regarding Right-of-Way Work. This is a large file 1.5M.